Rock-N-Roll All Night Long On The Las Vegas Strip!

Recapping the 2025 Las Vegas Rock ‘n’ Roll Marathon

The Energy. The Rhythm. The Perfect Execution.

The 2025 Las Vegas Rock ‘n’ Roll Marathon delivered unforgettable moments for runners and spectators alike, and at the heart of the event’s magic was AV Vegas. From soundscapes that energized the athletes to stunning visuals that captivated the crowd, our team ensured the marathon didn’t just race—it rocked.

Here’s how we made it all happen.

Bringing Every Beat to Life

Audio is the soul of the Rock ‘n’ Roll Marathon—and from the starting line to the afterparty, AV Vegas orchestrated a seamless sound experience that transformed the event into a high-energy celebration.

  • 8 Course Stages: Powered runners with music at every turn. Carefully crafted audio setups ensured crystal-clear sound across each stage.
  • Starting Line & Finish Line: From adrenaline-pumping bass to motivating announcements, participants were set up for success from takeoff to touchdown.
  • Resorts World Runners Village & After Party: To top it all off, the Runners Village and afterparty came alive with immersive sound systems and energy-efficient visuals.

Lighting Up the Course

With stunning strobes, spotlights, and stage effects strategically placed, the marathon’s electric ambiance remained unforgettable.

Overcoming Big Challenges with Big Solutions

Organizing an outdoor event on this scale comes with challenges, but our experienced team handled every logistical hurdle with ease:

  • Managed with robust AV setups designed to withstand Las Vegas conditions.
  • Large-scale audio-visual coordination? Delivered flawlessly, thanks to meticulous pre-planning and execution.

Closing the Chapter on 2025 Rock ‘n’ Roll Marathon

The 2025 Rock ‘n’ Roll Marathon wasn’t just an event—it was an experience, a celebration of rhythm, energy, and community. AV Vegas is proud to have played a pivotal role in making it all possible, creating moments that will be remembered long after the last runner crossed the finish line.

If you’re ready to bring this level of expertise, precision, and passion to your next event, contact AV Vegas today. Let’s create magic together.

 

12'x12' DJ Stage with 4 - 16' Lighting towers and a double-sided video wall. 12'x3' 3.9mm pixel density.  It was built in 1.75 hours and struck in 1hr.

12’x12′ DJ Stage with 4 – 16′ Lighting towers and a double-sided video wall. 12’x3′ 3.9mm pixel density.  It was built in 1.75 hours and struck in 1hr.

Talk to a real live human: 702-878-5050